Here are a few pictures after the sump was swapped. I also have been finishing up the firewall forward wiring, and avonics panel work. You'll see plenty of extra thread on the sump studs. They could have been an 1/8 inch shorter, but I'll take a little extra. I'll probably use an Adell clamp for the EGT & CHT wiring from the sensors, and attach it to the sump stud as well.
The Horz. Mixture cable bracket kit was easy to install, and so far I see no reason to modifiy anything yet. I also used vans Maniford pressure line kit, which has a reducer fitting, before attaching to the dynon manifold pressure sensor. The Throttle, mixture, and prop cables have been fitted, and just about ready for final attachment to instrument panel.
I hope to get the cowling on soon, and hang the prop.








